The M25 expressway () is a short north–south highway in Hungary. It connects the M3 motorway to the city of Eger.

Timeline SectionLengthOpenedNotesKál (M3) – Andornaktálya 20 July 2020Segment South, built between 2018 – 2020.Andornaktálya – Eger 7 November 2018Segment North, built between 2017 – 2018.

Route description The route is full length expressway. The maximum speed limit is 110 km/h, with (2x2 lane road).

CountykmTypeDestinationNotesHeves 0 – Budapest, Gyöngyös

– Nyíregyháza, Miskolc (M30), Debrecen (M35)The southern terminus of the expressway.

Kilometrage starting point

trumpet interchange 6 Laskó híd híd means Bridge 7 Main road 3 – Kerecsend / Main road 33 – Füzesabony 10Main road 251 – Maklár, Bosch factory 15 Main road 253 – Mezőkövesd, Andornaktálya 19 Main road 252 – Eger Centrum, towards to Main road 25 → ÓzdThe northern terminus of the expressway.

Maintenance The operation and maintenance of the road by Hungarian Concession Infrastructure Development Plc. This activity is provided by this highway engineer. near Kál (M3), kilometre trench 103

Payment Hungarian system has 2 main type in terms of salary:

1, time-based fee vignettes (E-matrica); Cars, vans and motorbikes up to 3.5 tonnes only need to buy a single vignette which costs 6,400 Hungarian forint (Ft) for 10 days, 10,360 Ft for 1 month and 57,260 Ft for a year, from 1 January 2024. 2, county vignettes (Megyei matrica); the highway can be used instead of the national sticker with the following county stickers: {| class="wikitable"Type of county vignette Available sectionHeves full length (0 km – 19 km)

See also

Roads in Hungary Transport in Hungary

References

External links National Toll Payment Services Plc. (in Hungarian, some information also in English) National Infrastructure Developer Ltd.